Thursday, November 1, 2012

October Update


Exterior work is almost complete.










Some of the LED light fixtures have been installed. These lights will be powered by a roof-mounted Photovoltaic solar array.



Some of the building's interiors.



The floor has been stained. Check out all that natural light. There are no electrical powered light fixtures in this image!